affordable-housing renovation site, Jackson MS
Walk the safety checklist.
The affordable-housing renovation site in Jackson MS runs no documented daily pre-task safety walk; fall, scaffold, and temporary-electrical hazards go unrecorded.
Not funded yet. Settles as earned credit, $512 proposed.
Proof it takes, the deadline, the level
- Proofphoto per checklist section + GPS + construction_site_safety findings log
- Open until2026-10-13
- Leveladvanced
All of it: the words, the place, the proof
The affordable-housing renovation site in Jackson MS runs no documented daily pre-task safety walk; fall, scaffold, and temporary-electrical hazards go unrecorded.
Fund it for $512. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- hard hat + safety glasses + hi-vis vest (site PPE)
- tablet/clipboard with the OSHA 1926 pre-task checklist
- camera
- GFCI outlet tester
- tape measure
- flashlight
Steps
- 1. Check in with the site's competent person; confirm scope, don required PPE, and confirm you observe-and-document only, no trade work, no entry into active hazard zones.
- 2. Walk the fall-exposure perimeter: photograph unprotected edges/openings 6 ft or greater, guardrail/cover condition, and any personal fall arrest anchorage in use (Subpart M).
- 3. Inspect scaffold and ladder condition: base/plumb/tie-in, planking, guardrails; ladder pitch (~4:1), footing, tie-off, and 3-ft landing extension (Subparts L/X).
- 4. Screen temporary electrical: cord condition, GFCI presence, panel access clearance; test accessible GFCI outlets with the tester and record trip/no-trip (Subpart K).
- 5. Record housekeeping and access/egress: trip/impalement hazards, material storage, walkways, and clear exit paths (Subpart C).
- 6. For each finding, mark condition against the OSHA 1926 checklist item, assign a tier (stop-work / correct-before-proceed / monitor), and name the responsible competent person.
- 7. Enter photos, GPS/address, checklist results, the GFCI test log, and the tiered findings list; sign. Route stop-work items to the competent person with a timestamp.
What counts as done
- Photo evidence at affordable-housing renovation site with timestamp
- GPS / address confirm
- GFCI test log (outlet ID + trip/no-trip)
- Tiered findings list (stop-work / correct-before-proceed / monitor)
- Timestamp of stop-work items routed to the competent person
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789296689839_5qufegs","funderWallet":"0xYOU"}.
Open, but not claimable yet. restricted: regulated — Regulated or permit-required work cannot be claimed on this rail yet. It stays readable; voting and pledging are free, and funding is separate from claiming.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1789296689839_5qufegs