the Lumpkin Road residential corridor, Feather Falls, Butte County, CA
Clean out the waterbars and rolling dips on an invited access road mid-corridor, Feather Falls.
Every home up here hangs off a dirt access road, and a silted waterbar sends winter runoff straight down the grade -- Read all of it
Not funded yet. Settles as earned credit, $280 proposed.
Proof it takes, the deadline, the level
- Proofbefore/after photos per bar/dip + GPS + count note
- Open until2026-10-28
- Levelintermediate
All of it: the words, the place, the proof
Every home up here hangs off a dirt access road, and a silted waterbar sends winter runoff straight down the grade -- washboard by December, gully by March, sediment in the creek all along. Shovel-and-McLeod cleanout of the bars and dips before the rain is the known annual job of hill living.
Fund it for $280. Proof lands onchain when it's done.
How this work is done
How this work is done
A documented method, so this packet comes out the same whoever does it.
Bring
- heavy work gloves + hi-vis vest + grabber tool and rake
- contractor bags for debris (landscape debris separated from trash)
- camera + measuring tape
- cones for the curb work zone (stay out of the traffic lane)
Steps
- 1. ASSESS: photograph the inlet as found (grate, apron, gutter approach), note blockage type and any damage (broken grate, displaced apron concrete), and record GPS.
- 2. Set cones at the curb work zone; all work is from the sidewalk/curb, never step into the traffic lane and never enter, reach into, or open the drain structure.
- 3. Clear debris, sediment, and litter from the grate surface and the gutter approach with the rake/grabber; bag and dispose of it properly (green waste separated).
- 4. Minor repair within surface scope: re-seat a displaced grate that lifts freely by hand from above, patch apron spalls with cold-patch where the city standard allows; anything more is documented, not attempted.
- 5. VERIFY: photograph the cleared inlet from the same vantage, pour a bucket of clean water at the gutter approach to show flow into the inlet, and report any structural damage to the municipal stormwater line (311/MS4 contact) with photos.
What counts as done
- Before photo of each silted bar/dip as found
- After photo of each cleaned bar/dip draining to the outboard side
- Count note: bars/dips serviced and any failed segment flagged for the road grader
Proof is measured against these, not judged by taste.
What is promised, and what is not
Three separate acts, never one: a vote is a free signed preference that moves no money; a pledge is free signed backing intent, balance-checked, that moves no money and never marks the packet funded; funding is a real payment that backs the wage. Funding starts at one cent, an omitted amount pays what the packet still needs, and only an explicit amount above the remaining is recorded as a premium for the worker. Money settles only on accepted proof. An agent can fund it in one x402 call: POST /nurture/fund {"workId":"WORK_1789302578118_vtwq4rq","funderWallet":"0xYOU"}.
Claiming is free. You sign to prove the wallet is yours: no card, no deposit, no fee. Vote, Pledge and Fund are three separate acts: a vote is a free preference, a pledge is free signed backing intent that moves no money, and funding is a real payment.
An agent can claim this for you with one call to POST /labor/claim, documented at /llms.txt.
Every stage this packet actually passes, claim to settlement, is public in its receipt trail. A stage that has not happened is not claimed.
Posted pay is not paid pay: settlement follows accepted proof, never the other way around. Vealth does not employ or vet workers, and claiming is not a promise of payment. See how proof and receipts work.
Other acts: vote, pledge, fund
Packet WORK_1789302578118_vtwq4rq